
Configuration 1
100–200 m Wheel-Mounted Water Well Rig
Wheeled · Listed depth: 100–200 m
View Equipment →Equipment / 23 catalogue configurations
Start with the borehole. Compare the configuration.
Explore portable, wheeled, crawler, trailer and truck-mounted configurations. Define your target depth, borehole diameter, ground conditions and drilling system before requesting a matched equipment package.

Depth, finished diameter, casing stages and expected water conditions.
Ground sequence and the proposed air, mud or combined drilling arrangement.
Access route, working footprint, unloading and movement between locations.
Rig, compressor or pump, rods, tools, hoses, spares and explicit exclusions.
Browse the family
Supplier-listed figures describe catalogue configurations. Confirm the actual technical sheet, conditions and included scope before ordering; entries are not a count of independently verified factory models.

Configuration 1
Wheeled · Listed depth: 100–200 m
View Equipment →

Configuration 3
Wheeled · Listed depth: 200 m
View Equipment →

Configuration 5
Wheeled · Listed depth: 200 m
View Equipment →






Configuration 12
Wheeled · Listed depth: 300 m
View Equipment →



Configuration 16
Truck-mounted · Listed depth: Confirm capacity
View Equipment →
Configuration 17
Truck-mounted · Listed depth: 600 m
View Equipment →

Configuration 19
Truck-mounted · Listed depth: 800 m
View Equipment →



Use these listing fields to narrow an enquiry. A depth, diameter or weight label is not a site-performance guarantee.
Start with the project fields above, then request the actual offered technical sheet and an itemised package. Open the product pages for listing details and configuration cautions.
Share the project brief through our contact page or WhatsApp. RigSpan coordinates equipment sourcing with manufacturing partners; final suitability and scope need written confirmation for the actual offer.
Share your project information with RigSpan for equipment sourcing and supply coordination.
Plan the tools and auxiliaries, compare the supply scope and prepare the shipment questions.