
Equipment / 4 catalogue configurations
Solar Pile Drivers
Bring the pile drawing to the equipment discussion.
Explore PV-series configurations for solar foundation enquiries. Match pile profile, handling requirements and the approved installation method to the actual ground and access conditions.

Define the job before the machine.
- Pile drawing
Profile, length, material and handling requirements.
- Installation brief
Approved method, embedment, tolerances and acceptance responsibility.
- Ground decisions
Investigation information, refusal response and any approved alternative method.
- Machine scope
Holder, hammer, guide arrangement, optional attachments and transport layout.
Browse the family
Equipment configurations.
Supplier-listed figures describe catalogue configurations. Confirm the actual technical sheet, conditions and included scope before ordering; entries are not a count of independently verified factory models.
Compare the listed configurations.
Use these listing fields to narrow an enquiry. A depth, diameter or weight label is not a site-performance guarantee.
| Configuration | Mounting | Listing reference |
|---|---|---|
| PV-15 Solar Pile Driver | Crawler | Listed weight: 1.5–2.0 t |
| PV-60 Solar Pile Driver | Crawler | Listed weight: 6.0–6.5 t |
| PV-100 Solar Pile Driver | Crawler | Listed weight: 10–12 t |
| PV-130 Solar Pile Driver | Crawler | Listed weight: 13–15 t |
Before you request a quotation.
Buyer questions.
How should I compare these configurations?
Start with the project fields above, then request the actual offered technical sheet and an itemised package. Open the product pages for listing details and configuration cautions.
Can RigSpan help prepare an enquiry?
Share the project brief through our contact page or WhatsApp. RigSpan coordinates equipment sourcing with manufacturing partners; final suitability and scope need written confirmation for the actual offer.
Turn the requirements into a clear enquiry.
Share your project information with RigSpan for equipment sourcing and supply coordination.
From equipment selection to a complete offer.
Plan the tools and auxiliaries, compare the supply scope and prepare the shipment questions.

