
400 m Crawler Water Well Rig
Crawler-mounted / Water well drilling
Water well, core drilling, blasthole and solar piling equipment. Share your site requirements with RigSpan to discuss a suitable configuration.
Equipment selection · Configuration discussion · Supply coordination
Start with the job. Then compare the machine and its configuration.

Crawler, trailer, truck-mounted and portable configurations for water well projects.
View Water Well Rigs →
Equipment for geological investigation, core recovery and site sampling.
View Core Rigs
YQD-series equipment for quarry and mining drilling applications.
View Blasthole Rigs

Crawler-mounted / Water well drilling

Trailer-mounted / Water well drilling

Core drilling / Geological sampling

PV-130 series / Solar foundation work


The rig is one part of the setup. Tell us your target depth, borehole diameter and ground conditions so we can discuss tooling, auxiliary equipment and spare parts with the manufacturer.
Compare rig and mounting options for your planned well construction.


Tell us the application, destination and site conditions.
Discuss a suitable rig and supporting equipment with us and the manufacturer.
Review the specification, supply scope, payment terms and delivery arrangements.
Agree the production or supply schedule, inspection and shipping responsibilities before proceeding.
Start with the application, target depth, borehole diameter and ground conditions. RigSpan can coordinate a configuration discussion with the manufacturer before you confirm a model.
No. Power units, mounting options and tooling can differ. Confirm the final technical specification and supply scope in your quotation.
Yes. Include the parts you need in your inquiry so compatibility and availability can be checked with the manufacturer.
Delivery schedules, shipping terms, warranty coverage and support responsibilities are agreed for the specific order and recorded in the quotation or contract.
Compare the borehole requirements, equipment layout and quotation before choosing a water well rig.
Explore Drilling Guides →Industry Insights
Read the context behind the specification, then bring a stronger brief to the supplier discussion.
Explore Industry Insights →Technical analysis / Water-well completion
A sourced buyer checklist for borehole development equipment, utilities, discharge handling and handover: separate development from drilling and pumping-test scope.
Pre-Shipment Evidence Checklist →Plan the tools and auxiliaries, compare the supply scope and prepare the shipment questions.
Parts & Tooling
Review mud pumps, drill rods and cutting tools, then prepare the connection and duty questions for the supplier.
Explore Parts & Tooling → · Browse the Download Library →Keep the machine identity, applicable manual and observed symptoms together for a supplier review.
Identify Equipment → · Maintenance Records → · Prepare a Service Request → · Equipment Support →Share what you need to drill or install. A few site details help us discuss the right equipment and prepare a relevant quotation.
Open the full inquiry form →