

Exact model appearance and included components require confirmation.
Solar Pile Drivers
PV-100 Solar Pile Driver
Discuss this solar piling configuration against the pile profile, installation method and ground conditions. A crawler configuration for discussing movement and positioning across a drilling site. Confirm access conditions, transport dimensions and stabilizer requirements with the proposed setup.
- Listed weight
- 10–12 t
- Mounting
- Crawler
- Equipment family
- Solar Piling
- Supply scope
- Configured to the project
Final configuration, pricing, delivery and support terms are confirmed for the specific order.
Configuration details.
| Equipment family | Solar Pile Drivers |
|---|---|
| Mounting configuration | Crawler |
| Supplier model | PV-100 |
| Listed operating weight | 10–12 t |
| Listed transport dimensions | Approx. 5200 × 2600 × 3200 mm |
| Listed engine power | 113 kW |
| Listed rotary head torque | 6500 N·m |
| Listed feed / hoist force | 60 / 80 kN |
| Maximum travel speed in listing | 0–3.0 km/h |
| Gradeability claim in listing | 35°; not an operating-slope approval |
These supplier-listed values describe a configuration, not a guarantee across all hole sizes and ground conditions. Confirm the final technical sheet and supply scope with your quotation.
Configuration evidence & enquiry sheet.
Supplier listing reviewed 17 October 2026
The supplier’s combined drilling / piling depth and diameter are not mast working height or maximum pile length and are not used as those limits. Gradeability is a supplier travel claim, not permission to operate on that slope. Confirm attachment, pile holder, working stability and the project-approved installation method.
Published values remain supplier catalogue claims. Obtain the accepted technical sheet for the offered revision before ordering.
- Profile drawing, overall length, material and embedment
- Driving / drilling / screw installation scope supported by the actual attachments
- Included tools, auxiliaries, spares and documentation
- Actual packing, inspection, delivery and support responsibilities
Plan around the job.
Solar foundation installation
Confirm the post or pile profile, required installation depth and acceptance criteria.
Project site deployment
Review terrain, site access and transport dimensions.
Pile installation planning
Discuss the installation method and required attachments before ordering.
Discuss the package.
Confirm what is included in the quotation. Supporting tools and attachments are selected to match the equipment and your planned work.
- Pile profile and mast configuration
- Installation attachments
- Transport and site positioning
- Wear parts and operating documentation
Before you choose.
What should I include in my inquiry?
Share the pile profile, ground conditions, installation method and project destination.
Does the listed capacity apply to every job?
No. Capacity depends on the specific configuration and working conditions. Confirm the relevant depth, diameter, tooling and power combination in the final technical sheet.
Can I include tools and spare parts?
Include your requirements in the inquiry so compatibility, availability and the included supply scope can be checked with the manufacturer.
How are shipping and warranty terms agreed?
Delivery, inspection, warranty coverage and support responsibilities are agreed for the specific order and recorded in the quotation or contract.
Put your project into the brief.
Discuss the equipment, supporting tools and the details that matter on your site.
Plan the complete equipment enquiry.
Plan the matching equipment package.
Identify, record and request support.
Keep the machine identity, applicable manual and observed symptoms together for a supplier review.
Identify Equipment → · Maintenance Records → · Prepare a Service Request → · Equipment Support →
