Solar Pile Installation Equipment for PV Foundations RigSpan application enquiry worksheet — 2026-10-17 https://rigspan.com/applications/solar-foundations.html Project / buyer: Destination: Project specialist / contact: Existing equipment: Pile design Provide: Pile section, dimensions, material, length and approved installation requirements Confirm: Confirm gripping / guiding arrangements and the offered attachment against the drawing. Your response: Evidence / drawing revision: Unresolved question / responsible party: Embedment and working space Provide: Target embedment, exposed height, total pile length and overhead constraints Confirm: Reconcile these with the actual working envelope; do not interchange height and depth fields. Your response: Evidence / drawing revision: Unresolved question / responsible party: Subsurface information Provide: Geotechnical report, hard layers, variability and available trial results Confirm: Have the project engineer define the installation method and refusal response. Your response: Evidence / drawing revision: Unresolved question / responsible party: Attachments Provide: Required driving, drilling or other method and existing attachment references Confirm: Confirm model, interfaces, operating data, hose / adapter scope and inclusion status. Your response: Evidence / drawing revision: Unresolved question / responsible party: Terrain and access Provide: Travel routes, working platform, clearances and transport constraints Confirm: Request the applicable operating limits; published gradeability is not permission to work on that slope. Your response: Evidence / drawing revision: Unresolved question / responsible party: Installation acceptance Provide: Position / alignment requirements, test plan, records and inspection responsibilities Confirm: Separate machine checks from pile / ground performance and project acceptance. Your response: Evidence / drawing revision: Unresolved question / responsible party: Related package: https://rigspan.com/equipment-packages/solar-pile-installation-package.html Planning worksheet only. Equipment suitability, supply scope and project acceptance require confirmation.